Hodnet – Wollerton Roadworks 12 July 2021
OpenReach are carrying out work from the end of Drayton Road, Hodnet and the Crossroads, Wollerton, between 08.30 and 15.00.
There will be two-way traffic signals and delays are possible.
OpenReach are carrying out work from the end of Drayton Road, Hodnet and the Crossroads, Wollerton, between 08.30 and 15.00.
There will be two-way traffic signals and delays are possible.
From Bletchley Dual Carriageway End to Upper College Junction.
There will be two-way traffic signals so delays are likely.
Between Hopton Church Junction and the Espley Roundabout, by Airband Community Internet.
There will be two-way signals and delays are possible.
The A49 will be closed from 09.30 on 17th June to 16.00 on 18th June between Grinshill junction and Lee Brockhurst junction for the urgent repair of carriageway defects.
There is the usual A41/A53 proposed diversion route.
Do take care.
A41 11th June from Sweet Appletree Crossroads to the Ternhill roundabout. There will be two-way traffic signals and delays are possible.
A442 11th-15th June from the Wrekin District Council boundary to Radmoor Crossroads. There will be two-way signals and delays are possible.
There will be roadworks on the A41 between Sweet Appletree Crossroads and the Ternhill Roundabout.
Multi-way traffic signals mean delays are inevitable.
The A41 will be closed from 09.30 27th May until 16.00 28th May between Bletchley Dual Carriageway End and Upper College Junction – through Sandford. This is for urgent repairs to carriageway defects.
The usual optimistically planned diversion will be in place, using the A53 and A49.
Traffic will, therefore, be significantly heavier in surrounding villages and on minor roads – please take care.
Severn Trent Water will be working outside the United Milking Systems site on the A53 close to the Tern Hill roundabout.
There will be two-way traffic signals and delays are inevitable.
Between the nursing home and Mytton Road, for surface dressing.
The closure information says that the closure will be ‘all the time’ and then gives a variety of dates when different work will be done before adding that the work is weather dependent and dates are subject to change!
The planned diversion is via the A49 and A41, so it is likely that traffic will be busier along quiet country lanes; do take care.
There will be a lane closure, Northbound, of the Bletchley dual carriageway as well as two-way signals between Tern Hill roundabout and the start of the dual carriageway.
Delays are likely.
Increased traffic through surrounding villages and lanes is very likely. Please take extra care.