Roadworks

A41 Closure 26 – 30 October 2020

The A41 will be closed from Bletchley Dual Carriageway End To Upper College Junction (near Sandford village) on these days between 09.30 – 16.00.

This is so that the speed limit reduction scheme can be completed.

There is a long planned diversion route using the A49 and A53 which could well mean that traffic uses the road through Hodnet and Marchamley instead – take care.

A442 Road Closures 28 Sept – 10 Oct 2020

A442 Dukes Drive to Waters Upton, Crudgington.

Overnight road closures, between 7pm and 7am, to allow for the installation of LED Stud and Refresh and Renew lining.

Alternative routes will be signed on site.

Meanwhile, traffic lights will still be on the A442 until the end of the month to allow for cabling and blockages and micro trenching, there are still blockages that need clearing – every few meters.

A442 Roadworks 16-22 September 2020

From Radmoor Crossroads to the A53 Espley Roundabout.

It’s more internet related works – Cabling/blockages and microtrenching.

There will be multi-way signals and delays are likely.

A442 Road Closure 10 September 2020

Between Radmoor Crossroads to the A53 Espley Roundabout, Hodnet, between 09.30 – 15.30 to allow for line painting.

There is a diversion, but it looks pretty long so allow extra time.

A53 Roadworks 6 September 2020

Yet more roadworks and this one has the potential to really slow a journey …

On the A53, from outside Ternhill Farm House to outside the Shell petrol station, Openreach will be carrying out overhead cabling across the carriageway.

There will be multi-way signals and delays are likely.

Watch out too for drivers trying to take a sneaky shortcut through the petrol station.

A49 Roadworks 1-9 September 2020

From Moston Junction to junction with B5065 Prees Green.

Excavations will be taking place for Fibre Cable in the verge.

There will be two-way signals and delays are likely.